Loading

Shopping cart

logo shape2 1 1

Allison MT Series Installation Checklist

  • Home
  • Allison MT Series Installation Checklist
shape_2 1 1

Allison MT Series Installation Checklist

DT#25212

Oil Cooler, Air Lines & Vacuum Lines

  • Confirm there are no leaks
  • Confirm tightness of all connections
  • Confirm correct routing of lines

Shift Selector

  • Confirm correct adjustment for all positions
  • Confirm ease of movement
  • Inspect neutral safety switch – start only in neutral
  • Ensure shift tower’s freedom of operation

Mechanical Modulator Control

  • Confirm correct adjustment – proper shift points
  • Confirm ease of operation
  • Confirm correct routing

Parking Brake

  • Adjust for proper clearance
  • Adjust for full apply
  • Confirm full release

Driveline

  • Confirm proper indexing of slip and universal joints
  • Confirm drive shaft angles are within recommendations
  • Check for excessive backlash
  • Ensure slip and universal joints are lubricated