Loading

Shopping cart

logo shape2 1 1

Allison HT Series Installation Checklist

  • Home
  • Allison HT Series Installation Checklist
shape_2 1 1

Allison HT Series Installation Checklist

DT#34195

Fluid Cooler & External Filter Lines

  • Confirm there are no leaks
  • Confirm tightness of all connections
  • Confirm correct routing of all lines

Manual Selector Valve

  • Confirm correct adjustment for all positions
  • Confirm ease of movement
  • Inspect neutral safety switch – start only in neutral
  • Ensure shift tower’s freedom of operation

Mechanical Modulator Control

  • Confirm correct adjustment – proper shift points
  • Confirm ease of operation
    recommendations
  • Confirm correct routing

Parking Brake

  • Adjust for proper clearance
  • Adjust for full apply
  • Confirm full release

Hydraulic Input Retarder

  • Confirm proper adjustment – full open and closed
  • Confirm ease of operation

Driveline

  • Confirm proper indexing of universal joints
  • Confirm drive shaft angles are within recommendations
  • Check for excessive backlash
  • Ensure slip and universal joints are lubricated

Hydraulic System

  • Recommended fluid
  • Confirm correct fluid level for operating conditions
  • Ensure dipstick is properly calibrated
  • Confirm tightness of fill tube cap
  • Confirm tightness of fill tube
  • Confirm breather is clean and free of restrictions
  • During operation, inspect for fluid leaks

Power Takeoff (PTO)

  • Confirm proper backlash established
  • Confirm controls are connected and functional
  • Confirm correct coupling to driven equipment

Instruments & Electrical Components

  • Confirm proper function of speedometer
  • Confirm proper function of temperature gauge
  • Confirm proper and functional wiring and electrical connections
  • Confirm proper function of reverse signal switch
  • Confirm proper function of neutral start switch