Allison 1000/2000 Series Installation Checklist

DT#18131

Oil Cooler, Air Lines & Vacuum Lines

  • Properly flush cooling system
  • Confirm correct routing of lines
  • Confirm tightness of all connections
  • Confirm there are no leaks

Throttle Sensor

  • Confirm proper adjustment
  • Confirm proper routing of cable and harness

Driveline

  • Confirm proper indexing of slip and universal joints
  • Confirm drive shaft angles are within recommendations
  • Check for excessive driveline backlash
  • Ensure slip and universal joints are lubricated

Hydraulic System

  • Confirm usage of recommended fluid – TransSynd™
  • Confirm correct fluid level for operating conditions
  • Ensure dipstick is properly calibrated
  • Confirm tightness of fill tube cap
  • Confirm tightness of fill tube
  • Confirm breather is clean and free of restrictions
  • During operation, inspect for fluid leaks

Instruments & Electrical Components

  • Confirm proper and functional wiring and electrical connections
  • Inspect instruments, gauges and lights to ensure proper function
  • Confirm shift selector display is on and “CHECK TRANS” light is off
  • Confirm proper function of fluid temperature gauge

Power Take Off (PTO) if installed

  • Confirm controls are connected and functional
  • Confirm correct coupling to driven equipment
  • Confirm transmission lube line is properly routed and connected
  • Confirm clutch apply line is installed and routed correctly